From the annual procurement plan
Plan entry
14 of 28 · FY 2082/83
Planned value
रु ८,६०,००,०००
Planned quarter
Second trimester
Budget line
3.6.1.14 — drainage, Bagmati
Unobligated on that line
रु ३१,००,००,०००
A procurement that is not in the published plan can still be made, but it is shown as an exception on
the plans page with this office’s name against it.
Scope is written once and flows into the notice, the bidding document and the contract.
Built from the Standard Bidding Document (Works) 2081. Three ITB clauses differ from the standard,
each with the reason the drafter gave; the approver sees all three together.
Clause
Standard says
This tender says
ITB 5.5
Turnover 1.5× the estimate
2.5× — drafter’s note: “complex urban site”
ITB 7.4
Generic equipment description
Names a paver make
ITB 22.1
30-day bidding period
15 days — drafter’s note: “monsoon”
▤ Bill of quantities · 38 items · ▤ Drawings · 44 sheets · ▤ Site photographs
Eligibility
स्वचालित जाँच · AUTOMATED CHECKSadvisory · you decide
✖
Bidding period of 15 days is below the 30 days Regulation 2064 r.31 requires for works above रु २० करोड.
A short period is the commonest ground on which a procurement is cancelled on review.
Set it to 30Cite an exception
✖
Clause 7.4 of the specification names a brand: “paver finisher of Vögele make or equivalent”.
Regulation 2064 r.11(3) prohibits naming a brand unless no generic description is possible. Suggested: “paver finisher, screed width 9 m or more, with electronic levelling”.
Use the suggested wordingJustify the brand
⚠
Turnover is set at 2.5 times the estimate; the median for comparable works is 1.5 times.
At 2.5× only 9 of 1,240 Class A firms qualify; at 1.5×, 41 do. Tenders in the top decile of turnover requirements attract 2.1 bidders on average, against 5.4 for the rest.
See the 9 firmsSet it to 1.5×Dismiss with a reason
⚠
Possible splitting: sections 1 and 2 of this road were tendered separately on 2082-05-28 and 2082-06-04, each just under the ICB threshold.
Three contiguous sections total रु ७१ करोड. Section 46 of the Act forbids splitting to avoid a method or an approval.
See the two tendersExplain the packaging
✔
Three checks passed: the budget line holds रु ३१ करोड unobligated, this is entry 14 in the published annual plan, and the Nepali and English texts agree.
Blocking items must be corrected, or justified in writing by the chief of the entity, before this tender can be published. Every justification is published with the tender.