Source: e-GP system, 22 January 2026. Design study — figures are the system's own published counts.
Answers drawn from the manuals, the Act and the Regulation, with the clause quoted. Hands over to a person whenever you ask.
By telephone
01-5971302 · 5971309 · 5971310
Ext. 500–503 · 7 AM to 7 PM, working days
Manuals · Forms · Standard operating procedure · Date converter
| Contract | Buyer | Supplier | Signed | vs estimate | Bidders | Checks |
|---|---|---|---|---|---|---|
| Nagdhunga–Naubise section 3Works · NCB | Department of Roads | Siddhi Construction | रु २२.५ क | −6.2% | 7 | clear |
| 132 kV transmission line, DangWorks · ICB | Nepal Electricity Authority | Him Electric JV | रु ४५.० क | +2.0% | 4 | clear |
| Bharatpur water supply, phase 1Works · NCB | Bharatpur Metropolitan City | Siddhi Construction | रु १८.२ क | −3.1% | 5 | 1 pattern |
| Hospital equipment, 12 districtsGoods · NCB | Ministry of Health and Population | Nepal Meditech | रु ९.१ क | −11.0% | 1 | 2 flags |
Checks are computed from published data. They indicate where to look, not that anything is wrong.
गुठी · the older ledger
Public works in Nepal are older than the state that now pays for them.
The guthi kept the temples, the rest houses, the stone water spouts and the paths — land set aside, accounts read out in the open, and the whole settlement able to see what had been spent and what had been built. A procurement system is the same ledger, kept for the same reason: so that what is bought with common money can be seen by the people it was bought for.